Skip to content

Bathroom Renovations in Maribyrnong

Bathroom renovations in Maribyrnong.

If the Maribyrnong bathroom has enough floor space but nowhere for toiletries, towels and washing, work out what needs to live in the room. Choose a shower and vanity layout once you know where that storage should go.

Council
Maribyrnong
Typical time on site
4–6 weeks
Contract
Fixed price

Account for the services you can’t see

Before moving a shower or toilet, ask where the wastes and supply lines run. If the room sits in a unit, check which services or walls belong to the lot and which need a discussion with the owners corporation.

Property checks in Maribyrnong

Check the planning property report and the building requirements that apply at the address. If you share services or common property with other lots, talk to the owners corporation about the proposed work before finalising your layout.

Take a closer look at a completed wet area

Our Altona bathroom pairs a black curved vanity and dark tapware with white finger tiles and terrazzo. If there’s a detail like that you want, bring a photo and we’ll talk it through against your own room.

Questions

Questions from Maribyrnong.

Can we keep the wet area in the same place?

Yes, that can be a useful option to price. We can discuss where a new screen, fittings and cabinetry would improve the room while retaining the main service positions.

How long does a bathroom renovation take?

Most bathrooms take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

Can you renovate more than one bathroom at once?

Yes. In West Footscray we renovated three bathrooms and the laundry in one job, on one contract.

What if you find damage behind the tiles?

We show you what we've found, price the fix and wait for your go-ahead.

Enquire

Discuss your Maribyrnong bathroom renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.