Renovation FAQs
Questions to ask before you renovate
There’s a lot to work out before a renovation. These answers can help you prepare for a first conversation and identify the decisions that need a closer look at your home.
Getting started
Make a short list of what you want the house to do differently. Identify anything you need to keep, then consider timing and how much you want to invest. Drawings and photos are useful if you have them.
Understanding the scope
Ask what an estimate is based on, when selections need to be made and what happens if the scope changes. If you’re talking to several builders, compare the inclusions and exclusions alongside the total.
Before you renovate
See the pageDo I need drawings before getting in touch?
You can start with photos, a brief or plans you already have. Tell us what stage your drawings are at so we can discuss the next step.
Can you help with design and approvals?
We can discuss the design-and-construct pathway and what consultant input or approvals your scope may need. Requirements depend on the property and the work.
Can we live at home during the work?
That depends on access, the construction stages and whether essential rooms remain usable. Bring up children, pets, work and access needs when we first discuss staging.
How long will the work take?
The time on site depends on the extent of the work, selections and the sequence of trades. Allow for design and any approvals before construction. Ask for a programme based on your scope.
What happens if something unexpected is found?
The team assesses the issue and explains the effect on the scope. Ask how a variation would be documented and how any change to cost or time would be agreed.
What should I keep after handover?
Keep relevant certificates, product and care information, records of agreed variations and the handover documentation together.
Design & construct
See the pageWhat is design and construct?
One builder is responsible for both the design and the build, under one contract. If something in the drawings doesn't work on site, it's our problem to solve, not an argument between two firms.
How long does design and construct take?
Two stages. Design and permits come first, and their length depends mostly on your council. Then the build: usually 4–6 weeks on site for a single room and 3–6 months for a full home, to a finish date in your contract.
What does the interior design include?
On new design & construct projects, we include up to $10,000 of interior design: space planning, materials and finishes, and your fixtures and fittings, chosen with the design studios we partner with.
Do you handle council and permits?
Yes. We brief the structural engineer, prepare the planning and building permit applications and deal with council for you.
Can the price change after I sign?
Only with your approval. If you change the scope, or we find a problem once the walls are open, we price it and you say yes or no before the work is done.
Kitchen renovations
See the pageHow long does a kitchen renovation take?
Most kitchens take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.
How long will we be without a kitchen?
We'll tell you at the first visit, once we've seen the house, and plan the job to keep that window as short as we can.
Can you take out a wall to open up the kitchen?
Yes. We arrange the structural engineering and any permits, and build it on the same contract as the kitchen.
Do you help with the design?
Yes. On design & construct projects, up to $10,000 of interior design is included: layouts, finishes and selections, worked through with the interior designers we partner with and priced into your fixed price.
Is the price fixed?
Yes. The price you sign covers the agreed scope. If you change the scope, we price the change and you approve it before we do it. Nothing goes on your bill until you've said yes.
Bathroom renovations
See the pageHow long does a bathroom renovation take?
Most bathrooms take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.
Can you renovate more than one bathroom at once?
Yes. In West Footscray we renovated three bathrooms and the laundry in one job, on one contract.
What if you find damage behind the tiles?
We show you what we've found, price the fix and wait for your go-ahead.
Do you do ensuites and powder rooms?
Yes. In Altona we built a bathroom and a separate powder room in the same job.
Laundry renovations
See the pageDo you renovate just a laundry?
Yes. We take on laundries on their own, planned and priced like any other room.
How long does a laundry renovation take?
Like our other single-room jobs, 4–6 weeks on site once design is done. The finish date is written into your contract.
Can you do the laundry with a bathroom or kitchen?
Yes. Nicole in Brookfield did her laundry and kitchen together. Cassandra in West Footscray did hers with three bathrooms and new drainage.
Full home renovations
See the pageHow long does a full home renovation take?
Most full homes take 3–6 months on site. Design and permits come first, and how long they take depends on your council and whether there's an overlay.
Can we live in the house during the renovation?
Sometimes. It depends on the scope and whether the job can be staged. We'll answer it for your house at the first visit.
Do you renovate period and heritage homes?
Yes. Victorian and Edwardian homes are a specialty, including homes under heritage overlays.
Can you add an extension at the same time?
Yes. Second-storey and ground-floor extensions go on the same contract as the renovation.
Home extensions
See the pageShould we go up or build out the back?
It depends on your block, your budget and whether the existing house can carry a second storey. We'll tell you which makes sense at the first visit.
Do you handle the engineering and permits?
Yes. The drawings, engineering and permits are part of your contract with us, so you're not hiring an engineer or chasing council yourself.
Can we stay in the house while you build?
Often, because most of an extension is built outside the rooms you live in. The disruption comes when old and new are joined, and we'll tell you when that is before it starts.
Can you renovate the rest of the house at the same time?
Yes. Renovations and extensions go on one contract, so the kitchen, bathrooms and new rooms are planned together.
Heritage restorations
See the pageDo I need a permit to renovate a heritage home?
Under a heritage overlay, most changes you can see from the street need a planning permit. We check your property's overlay and lodge what's needed.
Can we add an extension to a period home?
Usually, yes, at the back where the street sees less of it. Council will want the new part to sit quietly behind the original house.
What if you find problems in the old structure?
You see it first. We walk you through the problem and the price to fix it, and the work only starts once you've agreed.
Have you renovated a heritage-listed home?
Yes. As well as period homes under heritage overlays, we've renovated a heritage-listed house.
Enquire
Ask us about your home
A short form to start. Here's what happens next.
Prefer to call? 1300 909 808
Up to $10,000 of interior design included on new design & construct projects.
- 1
A free phone or video conversation
About the project, the location, where you’re up to and your priorities.
- 2
Builder review
The builder reviews the scope and preliminary estimate before talking it through with you.
- 3
In-depth consult, if you go ahead
A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.
- 4
Design, documents and contract
Before anything is built.