Skip to content

Period home renovations in Melbourne

Renovate a period home without losing what drew you to it

There may be parts of your house you’d never want to change. A front room with beautiful proportions, an original fireplace or a familiar roofline can give the renovation a place to begin.

Specialty
Period homes
Contract
Fixed price
Finish date
In writing

Work out what deserves to stay

Photograph the elements you value and record their condition. Some can be retained as they are, others may need attention, and some may shape where you put the new work. Make those decisions with the layout in view.

Check the address early

Use a Victorian planning property report and ask the relevant council how controls apply to the work you’re considering. If your property has a heritage overlay, discuss the proposed scope before settling on demolition, a new opening or an addition.

Think about the transition from old to new

A rear addition can change how you use the entire house. Look at the roof junction, the route through the original rooms and the places where old and new materials meet. Good drawings let you discuss those details before construction.

Allow for what you can only see on site

The age and condition of floors, walls and concealed services can influence the work. Talk through what can be assessed up front and how a newly discovered issue would be recorded.

Our clients

Fixing the basics first.

  • We were just hoping for a safe and dry home and what we got was a really beautiful home that we're very proud of.
    Cassandra FraserBathrooms, laundry & drainage · West Footscray

Pricing

How this is priced.

We price this kind of work after a consultation, not from a published starting rate.

Price basis

Priced after consultation

Heritage restoration is priced after a consultation, once we know what needs retaining, repairing and approving.

In-depth home consult

From $250 + GST ($275 incl. GST)

  • Subject to distance and scope of works.
  • Free in-depth consults for local homes in postcode 3012.
  • If you choose Forefront as your builder, the consult fee is credited against your total bill. Terms are confirmed before you book.
  • Initial phone or video conversations are free.

Questions

Asked at every first visit.

Does every period home have a heritage overlay?

No. Check the property by address and ask council which controls apply. Age and appearance alone do not establish the planning requirements.

Can I add a contemporary extension?

A contemporary addition can be considered as part of the design. The site, the existing house and any planning controls will shape what can be proposed.

Do I need a permit to renovate a heritage home?

Under a heritage overlay, most changes you can see from the street need a planning permit. We check your property's overlay and lodge what's needed.

Can we add an extension to a period home?

Usually, yes, at the back where the street sees less of it. Council will want the new part to sit quietly behind the original house.

What if you find problems in the old structure?

You see it first. We walk you through the problem and the price to fix it, and the work only starts once you've agreed.

Have you renovated a heritage-listed home?

Yes. As well as period homes under heritage overlays, we've renovated a heritage-listed house.

Is the price fixed?

Yes. The price you sign covers the agreed scope. If you change the scope, we price the change and you approve it before we do it. Nothing goes on your bill until you've said yes.

Are there fees before the contract?

The first phone or video conversation is free. The in-depth home consult is from $250 + GST ($275 incl. GST), or from $350 + GST ($385 incl. GST) for full homes and extensions, subject to distance and scope of works, and free for local homes in postcode 3012. A paid consult fee is credited against your total bill if you build with us, subject to terms. A contract-preparation fee, based on project value, is credited against the contract price.

Enquire

Discuss your period home

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.