Skip to content

Bathroom renovations in Melbourne

A bathroom that works through the morning rush

A bathroom earns its keep every morning and every night. Start with who uses it, what needs to be within reach and which parts of the layout make it harder to get ready.

Typical time on site
4–6 weeks
Contract
Fixed price
Finish date
In writing

Use the floor plan to solve the daily problems

Check how the door, shower screen and vanity drawers move when someone is in the room. A longer vanity may give you the storage you want, while a better shower entry may free up more floor area. If you’re weighing up a bath, think about how often it’s used and what it takes to clean around it.

Plan behind the finishes

The position of wastes, the condition of the floor and the way the room is ventilated all affect the work. Bring those questions into the early design so the tile, screen and cabinetry choices suit the space and the waterproofing details.

Compare scopes carefully

Moving plumbing, changing the floor and replacing damaged substrates involve different work from retaining a good layout. Ask what the scope covers from strip-out through fit-off and where allowances still apply.

See the details in a finished room

Our Altona bathroom shows how the finishes and fittings meet up close. Note the details you like and bring a photo of the room you have now.

Recent bathrooms

Bathrooms we've built.

  • They took an absolute disaster and turned it into something really beautiful.
    Cassandra FraserBathrooms, laundry & drainage · West Footscray

Pricing

Starting prices by range.

Guide starting prices, not quotes. Your final price depends on the agreed scope, documented inclusions, your selections and the project’s requirements.

Main bathroom starting prices

  • Entry Range

    From

    $33,000incl. GST

    $30,000 + GST

    Typically a rental property, or a first-home buyer on a budget.

  • Premium Range

    From

    $38,500incl. GST

    $35,000 + GST

    Living there for 3–5 years, an investment property, or renovating with the intention to sell.

  • Signature Range

    From

    $49,500incl. GST

    $45,000 + GST

    Living there for 5–10 years, adding space and value as a step towards a forever home.

  • Platinum Range

    Price on application

    Bespoke, custom work for a forever home.

Detailed inclusions are confirmed in your project proposal. The years describe the kind of ownership each range suits, not build times or warranties.

All bathroom starting prices, incl. GST
RoomEntryPremiumSignaturePlatinum
Main bathroom$33,000$38,500$49,500POA
Ensuite$27,500$33,000$38,500POA
Powder room$16,500$22,000$27,500POA

In-depth home consult

From $250 + GST ($275 incl. GST)

  • Subject to distance and scope of works.
  • Free in-depth consults for local homes in postcode 3012.
  • If you choose Forefront as your builder, the consult fee is credited against your total bill. Terms are confirmed before you book.
  • Initial phone or video conversations are free.

More than one space

Renovating more than one space? Ask about a tailored package. Starting prices aren’t added together into a quote.

Questions

Asked at every first visit.

Do I need to move the plumbing?

Often you can explore a design that keeps the main fixtures close to their current positions. We can assess access, existing conditions and whether changes would make the room easier to use.

Can you renovate a bathroom and ensuite together?

Talk to us about both rooms and which facilities need to stay usable. The scope and work sequence can then be discussed together.

How long does a bathroom renovation take?

Most bathrooms take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

Can you renovate more than one bathroom at once?

Yes. In West Footscray we renovated three bathrooms and the laundry in one job, on one contract.

What if you find damage behind the tiles?

We show you what we've found, price the fix and wait for your go-ahead.

Do you do ensuites and powder rooms?

Yes. In Altona we built a bathroom and a separate powder room in the same job.

Is the price fixed?

Yes. The price you sign covers the agreed scope. If you change the scope, we price the change and you approve it before we do it. Nothing goes on your bill until you've said yes.

Are there fees before the contract?

The first phone or video conversation is free. The in-depth home consult is from $250 + GST ($275 incl. GST), or from $350 + GST ($385 incl. GST) for full homes and extensions, subject to distance and scope of works, and free for local homes in postcode 3012. A paid consult fee is credited against your total bill if you build with us, subject to terms. A contract-preparation fee, based on project value, is credited against the contract price.

Enquire

Discuss your bathroom renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.