Skip to content

Bathroom Renovations in Sunshine

Bathroom renovations in Sunshine.

If you’re updating a Sunshine bathroom that’s been changed over time, identify which parts work well and which need attention. Decide whether the main aim is better access, more storage or an easier shower to use.

Council
Brimbank
Typical time on site
4–6 weeks
Contract
Fixed price

Resolve the floor before choosing the tile

Where earlier work has changed the levels, look at how the new floor would meet the hallway. The substrate, drainage and wet-area design matter for both the layout and the finished entry.

Property checks in Sunshine

Check the property address and scope before assuming what approvals are needed. Brimbank planning information is a useful starting point if your plans affect the outside of the building or an existing heritage feature.

Take a closer look at a completed wet area

Our Altona bathroom pairs a black curved vanity and dark tapware with white finger tiles and terrazzo. If there’s a detail like that you want, bring a photo and we’ll talk it through against your own room.

Questions

Questions from Sunshine.

What if water damage is found during removal?

Ask how it will be assessed, documented and scoped. Existing conditions can affect the work needed before new finishes go in.

How long does a bathroom renovation take?

Most bathrooms take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

Can you renovate more than one bathroom at once?

Yes. In West Footscray we renovated three bathrooms and the laundry in one job, on one contract.

What if you find damage behind the tiles?

We show you what we've found, price the fix and wait for your go-ahead.

Enquire

Discuss your Sunshine bathroom renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.