Skip to content

Kitchen Renovations in Kensington

Kitchen renovations in Kensington.

When the kitchen in a Kensington home shares space with dining or a hallway, draw the way people get around the table before committing to an island. A different bench shape may solve more than additional cabinetry.

Council
City of Melbourne
Typical time on site
4–6 weeks
Contract
Fixed price

Choose what stays visible

Put everyday items close to the spot where you use them. Decide whether open shelves will hold things you reach for or whether drawers and tall cupboards would give you a quieter view from the living area.

Property checks in Kensington

Check the property address and scope before assuming what approvals are needed. City of Melbourne planning information is a useful starting point if your plans affect the outside of the building or an existing heritage feature.

See the kitchen in the context of the home

Look through our Footscray renovation for a view of the kitchen beside the living area. Note where you’d like the connections between rooms in your home to feel different.

Questions

Questions from Kensington.

Is a peninsula a better fit than an island?

Compare both on your plan with appliance doors open. A peninsula can give more bench with one end fixed, while an island can leave a route around both sides if the space allows.

How long does a kitchen renovation take?

Most kitchens take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

How long will we be without a kitchen?

We'll tell you at the first visit, once we've seen the house, and plan the job to keep that window as short as we can.

Can you take out a wall to open up the kitchen?

Yes. We arrange the structural engineering and any permits, and build it on the same contract as the kitchen.

Enquire

Discuss your Kensington kitchen renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.