Skip to content

Kitchen Renovations in Maidstone

Kitchen renovations in Maidstone.

If your Maidstone kitchen has been moved or altered in the past, put the existing walls, doors and services on a measured plan. Find out what can stay before moving the room or changing the connection to the living area.

Council
Maribyrnong
Typical time on site
4–6 weeks
Contract
Fixed price

Plan the scope around the areas you’ll see

Ask what the new layout will reveal at the floor and wall edges. If a run of joinery comes out, consider which finishes need to continue and whether any adjoining surfaces should be included in the scope.

Property checks in Maidstone

Check the property address and scope before assuming what approvals are needed. Maribyrnong planning information is a useful starting point if your plans affect the outside of the building or an existing heritage feature.

See the kitchen in the context of the home

Look through our Footscray renovation for a view of the kitchen beside the living area. Note where you’d like the connections between rooms in your home to feel different.

Questions

Questions from Maidstone.

Can we do cabinetry now and open a wall later?

You can discuss staging. First identify how the future opening would affect the cabinetry, floor and services so the early work can support the later plan.

How long does a kitchen renovation take?

Most kitchens take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

How long will we be without a kitchen?

We'll tell you at the first visit, once we've seen the house, and plan the job to keep that window as short as we can.

Can you take out a wall to open up the kitchen?

Yes. We arrange the structural engineering and any permits, and build it on the same contract as the kitchen.

Enquire

Discuss your Maidstone kitchen renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.