Skip to content

Kitchen Renovations in Newport

Kitchen renovations in Newport.

If you come in through the back of your Newport home, draw the path from the door to the fridge, bench and place you leave your keys. Keeping that route out of the prep area makes the room easier to use when everyone arrives together.

Council
Hobsons Bay
Typical time on site
4–6 weeks
Contract
Fixed price

Place the sink and bench with the outlook in mind

Think about where you spend the most time standing and what you’d like to see from there. Test the sink and prep surface against the existing windows and doors, then see what the services allow.

Property checks in Newport

Check the property address and scope before assuming what approvals are needed. Hobsons Bay planning information is a useful starting point if your plans affect the outside of the building or an existing heritage feature.

See a finished kitchen first

Start with the wider photos of the Footscray kitchen and living area. Note the relationship between joinery, flooring and daylight. Then consider which of those ideas would suit your rooms and what would need to change.

Questions

Questions from Newport.

Can we keep a good window when the layout changes?

Usually it’s worth designing around a window you like. Consider sill height, fittings and what the new joinery would cover or leave clear.

How long does a kitchen renovation take?

Most kitchens take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

How long will we be without a kitchen?

We'll tell you at the first visit, once we've seen the house, and plan the job to keep that window as short as we can.

Can you take out a wall to open up the kitchen?

Yes. We arrange the structural engineering and any permits, and build it on the same contract as the kitchen.

Enquire

Discuss your Newport kitchen renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.