Skip to content

Kitchen Renovations in Seddon

Kitchen renovations in Seddon.

In a Seddon home with a compact rear plan, a deeper island can leave less space for moving around the table. Draw the furniture and main routes before making the joinery larger.

Council
Maribyrnong
Typical time on site
4–6 weeks
Contract
Fixed price

Use one wall for the jobs that need height

Consider placing the fridge, pantry and ovens where they don’t block natural light or make the entrance feel tight. Leave a useful bench between the sink and cooktop and account for the way each appliance opens.

Property checks in Seddon

Check the property address and scope before assuming what approvals are needed. Maribyrnong planning information is a useful starting point if your plans affect the outside of the building or an existing heritage feature.

See a finished kitchen first

Start with the wider photos of the Footscray kitchen and living area. Note the relationship between joinery, flooring and daylight. Then consider which of those ideas would suit your rooms and what would need to change.

Questions

Questions from Seddon.

Can we make space for two people to cook?

Draw the two positions you use most and test the space between them. You may get more from a clearer aisle and a second prep spot than from increasing the overall footprint.

How long does a kitchen renovation take?

Most kitchens take 4–6 weeks on site. Design and any permits come first, and the finish date is written into your contract before work starts.

How long will we be without a kitchen?

We'll tell you at the first visit, once we've seen the house, and plan the job to keep that window as short as we can.

Can you take out a wall to open up the kitchen?

Yes. We arrange the structural engineering and any permits, and build it on the same contract as the kitchen.

Enquire

Discuss your Seddon kitchen renovation

A short form to start. Here's what happens next.

Prefer to call? 1300 909 808

Up to $10,000 of interior design included on new design & construct projects.

Add more detail (optional)

A preference, not a booking.

Helps us understand the project. It isn’t used to set the estimate.

Interest only, not a selection or a quote.

The first phone or video conversation is free. See our privacy policy.

  1. 1

    A free phone or video conversation

    About the project, the location, where you’re up to and your priorities.

  2. 2

    Builder review

    The builder reviews the scope and preliminary estimate before talking it through with you.

  3. 3

    In-depth consult, if you go ahead

    A consult at your home, from $250 + GST, or $350 + GST for full homes and extensions (subject to distance and scope; free in postcode 3012). If you choose Forefront as your builder, a paid fee is credited against your total bill.

  4. 4

    Design, documents and contract

    Before anything is built.